Hewish Building Group

Renovation

Strathalbyn Street

Kew | Victoria

All timber materials were reclaimed from a trestle bridge in Monto Queensland. The timbers were prepared and the structure was built off site in a large shed. We used cranes trucks and crane in five different stages to erect the structure on site.

Along with the outdoor structure, seating and garden beds we created a pool house that consisted of a full bathroom and steam room finished in stunning natural Elba stone slabs and tiles by Artedomus. The entire project was very technical, labour intensive and required great skill from all tradesman involved.


This project was a finalist at the HIA awards 2019.